Wednesday, June 26, 2019

Oakbrook Townhouses Board Meeting Minutes June 10 2019



Minutes of Board of Directors Meeting
June 10, 2019
Oakbrook Townhouses, Inc.
c/o Northwest Properties Agency, Inc.
9527 Bridgeport Way SW
Lakewood, WA 96499

The regular meeting of the Board of Directors of Oakbrook Townhouses (OT) was held May 13, 2019 at the home of Mike McDonald, 7531 Zircon Drive SW, Lakewood, WA.

A quorum being present, Board President Ken Karch called the meeting to order at 7:05 PM.

Board members present were Al Glamba, Dave Hamann, Ken Karch, Mike McDonald, Jim Pearcy, Carol Rehnberg, Steve Rinnan, and Mike Tierney. Also attending were members  Kathy Johnson, Lew Mildon, Cathie Reid, and Dennis Shuler; guest Tim Lancaster; and Bill and Pat Price from Northwest Properties.

Member Comments

Members present addressed a fallen tree near 7601 Zircon; drainage below some of the roof outlets (commonly called scuppers); burning of building materials behind a unit; timeliness of responses from NWP and the Oakbrook Townhouses maintenance contractor.

Minutes

Hamann moved and Mike McDonald seconded to approve the May 13, 2019 Board meeting minutes as submitted.  The motion passed.

Treasurer’s Report

Pearcy presented the Treasurer’s Report, including payments for the roofing projects.  Mike McDonald moved and Mike Tierney seconded to accept the Treasurer’s report and financials discussion.  The motion passed.

Following discussion, Mike Tierney was appointed to perform liaison responsibilities between the Board and Northwest Properties.

Old Business

Karch reported that the reroofing of Buildings 7, 8, and 9 is completed.  Members reported some unfinished work on Building 9.

Karch reported that work on reroofing of Buildings 1, 3, 4, 5, and 6 has started following approval for delivery of materials, with work on Building 6 being complete.  All this work is warranty correction work at no cost for the new roofing material.

Karch reported that work on the rear drainage mapping project has been completed by Drain-Pro of Puyallup for Buildings 1 through 6.  The product has been received and appears to be complete.  The contractor will be contacted next week to clarify some issues.

Karch reported that Beyler Engineering of Lakewood would be contacted to perform an assessment of the slope stability issues at 7513 Zircon raised at the last meeting.

Karch reported that work on driveway replacement at 7415 is complete and the owner has indicated satisfaction. 

Karch reported that the earthquake insurance payment previously approved by the Board has been made.

Karch reported that Hamann, McDonald, and Karch met two weeks ago to consider alternative locations for proposed cluster mailbox #2, after concerns expressed last month by a member at 7631 Zircon, and are proposing a location about 10 feet to the west of the centerline between Buildings 3 and 4.  Photos were passed out showing vegetation which would need to have to be removed and/or relocated.  Glamba requested that the minutes reflect that the owner may request the USPS to deliver mail to his door; that the top height of the cluster boxes is 62 inches above the concrete foundation slab, thereby discouraging pickup from idling vehicles; and that owners will be discouraged from picking up mail from their vehicles.  Karch reported that only 10 homeowners reside in Buildings 3 and 4, and that a recent City of Lakewood traffic study showed an average of 1482 vehicles per day on Zircon Drive.  Karch reported we had received two proposals and a demurral from a third.  After discussion, Hamann moved and Tierney seconded that the Board accept the proposal from the MailboxGuy for six cluster mailboxes at $12,799.80, including installation and taxes, and authorize the President to execute necessary documents.  The motion carried.  NWP was asked to notify the contractor to secure timing and responsibility for locating buried utilities, and to manage the contract. 

Karch reported on a proposal received for stabilization of the slope behind 7507.  The Board has one proposal and had authorized securing additional proposals, and has identified contractors who may be asked to do so.  Since the last meeting, members have questioned whether the responsibility for such work, when changes have been made in the rear topography by homeowners, may fall on the homeowner. 

Karch asked the Board to consider the broader question of more clearly defining the relative responsibility of the association vs. the individual homeowners in the common area to the rear of the property, and agreed to do so at the next meeting.  Following discussion, Karch appointed Glamba, McDonald, and Tierney to investigate and report to the Board at the next meeting.

Karch described the history of the non-compliance issue at 7509 Zircon, including the mailing of a letter and a compliance agreement to the owner; compliance investigations; discussions with neighbors and with family members of the owner; and concerns expressed by members at the last Board meeting.  Following discussion, Pearcy moved and Rehnberg seconded to secure legal representation to secure compliance with the Oakbrook Townhouses CC&Rs, Bylaws, and House Rules.  The motion carried.
  
New Business

Karch raised the issue of difficulty backing out of member driveways as a result of obscuring vegetation, and recommended an assessment of such conditions throughout Oakbrook Townhouses.  McDonald and Rinnan volunteered to do such an assessment and report back to the Board.

Karch raised the personal safety issues raised by members at the last meeting, and suggested we ask NWP to identify any similar responses from other HOAs, and asked Board members to offer any suggestions for discussion at the next Board meeting.

Karch raised the question of whether a repeat of the customer survey the Board initiated in 2014 was in order.  Following discussion, the Board agreed to conduct a customer survey in 2019, and to consider a proposal at the next Board meeting.

Karch asked the Board to consider doing a driveway condition assessment in 2019.  Following discussion, McDonald and Rinnan agreed to conduct a driveway assessment and report back at the next Board meeting.

Members asked that the gutters and downspouts be cleared, as soon as the roofing jobs are completed.

Next Meeting

The next regular Board meeting will be held July 8, 2019 at the home of Mike Tierney, 7409 Zircon Drive SW, at 7:00 PM.

It was moved and seconded to adjourn the meeting.  The motion passed and the meeting was adjourned at 8:54 PM.

Respectfully submitted,


_____________________________
Ken Karch, PE, Board President

No comments:

Post a Comment