Wednesday, June 26, 2019

Oakbrook Townhouses Board Meeting Minutes June 10 2019



Minutes of Board of Directors Meeting
June 10, 2019
Oakbrook Townhouses, Inc.
c/o Northwest Properties Agency, Inc.
9527 Bridgeport Way SW
Lakewood, WA 96499

The regular meeting of the Board of Directors of Oakbrook Townhouses (OT) was held May 13, 2019 at the home of Mike McDonald, 7531 Zircon Drive SW, Lakewood, WA.

A quorum being present, Board President Ken Karch called the meeting to order at 7:05 PM.

Board members present were Al Glamba, Dave Hamann, Ken Karch, Mike McDonald, Jim Pearcy, Carol Rehnberg, Steve Rinnan, and Mike Tierney. Also attending were members  Kathy Johnson, Lew Mildon, Cathie Reid, and Dennis Shuler; guest Tim Lancaster; and Bill and Pat Price from Northwest Properties.

Member Comments

Members present addressed a fallen tree near 7601 Zircon; drainage below some of the roof outlets (commonly called scuppers); burning of building materials behind a unit; timeliness of responses from NWP and the Oakbrook Townhouses maintenance contractor.

Minutes

Hamann moved and Mike McDonald seconded to approve the May 13, 2019 Board meeting minutes as submitted.  The motion passed.

Treasurer’s Report

Pearcy presented the Treasurer’s Report, including payments for the roofing projects.  Mike McDonald moved and Mike Tierney seconded to accept the Treasurer’s report and financials discussion.  The motion passed.

Following discussion, Mike Tierney was appointed to perform liaison responsibilities between the Board and Northwest Properties.

Old Business

Karch reported that the reroofing of Buildings 7, 8, and 9 is completed.  Members reported some unfinished work on Building 9.

Karch reported that work on reroofing of Buildings 1, 3, 4, 5, and 6 has started following approval for delivery of materials, with work on Building 6 being complete.  All this work is warranty correction work at no cost for the new roofing material.

Karch reported that work on the rear drainage mapping project has been completed by Drain-Pro of Puyallup for Buildings 1 through 6.  The product has been received and appears to be complete.  The contractor will be contacted next week to clarify some issues.

Karch reported that Beyler Engineering of Lakewood would be contacted to perform an assessment of the slope stability issues at 7513 Zircon raised at the last meeting.

Karch reported that work on driveway replacement at 7415 is complete and the owner has indicated satisfaction. 

Karch reported that the earthquake insurance payment previously approved by the Board has been made.

Karch reported that Hamann, McDonald, and Karch met two weeks ago to consider alternative locations for proposed cluster mailbox #2, after concerns expressed last month by a member at 7631 Zircon, and are proposing a location about 10 feet to the west of the centerline between Buildings 3 and 4.  Photos were passed out showing vegetation which would need to have to be removed and/or relocated.  Glamba requested that the minutes reflect that the owner may request the USPS to deliver mail to his door; that the top height of the cluster boxes is 62 inches above the concrete foundation slab, thereby discouraging pickup from idling vehicles; and that owners will be discouraged from picking up mail from their vehicles.  Karch reported that only 10 homeowners reside in Buildings 3 and 4, and that a recent City of Lakewood traffic study showed an average of 1482 vehicles per day on Zircon Drive.  Karch reported we had received two proposals and a demurral from a third.  After discussion, Hamann moved and Tierney seconded that the Board accept the proposal from the MailboxGuy for six cluster mailboxes at $12,799.80, including installation and taxes, and authorize the President to execute necessary documents.  The motion carried.  NWP was asked to notify the contractor to secure timing and responsibility for locating buried utilities, and to manage the contract. 

Karch reported on a proposal received for stabilization of the slope behind 7507.  The Board has one proposal and had authorized securing additional proposals, and has identified contractors who may be asked to do so.  Since the last meeting, members have questioned whether the responsibility for such work, when changes have been made in the rear topography by homeowners, may fall on the homeowner. 

Karch asked the Board to consider the broader question of more clearly defining the relative responsibility of the association vs. the individual homeowners in the common area to the rear of the property, and agreed to do so at the next meeting.  Following discussion, Karch appointed Glamba, McDonald, and Tierney to investigate and report to the Board at the next meeting.

Karch described the history of the non-compliance issue at 7509 Zircon, including the mailing of a letter and a compliance agreement to the owner; compliance investigations; discussions with neighbors and with family members of the owner; and concerns expressed by members at the last Board meeting.  Following discussion, Pearcy moved and Rehnberg seconded to secure legal representation to secure compliance with the Oakbrook Townhouses CC&Rs, Bylaws, and House Rules.  The motion carried.
  
New Business

Karch raised the issue of difficulty backing out of member driveways as a result of obscuring vegetation, and recommended an assessment of such conditions throughout Oakbrook Townhouses.  McDonald and Rinnan volunteered to do such an assessment and report back to the Board.

Karch raised the personal safety issues raised by members at the last meeting, and suggested we ask NWP to identify any similar responses from other HOAs, and asked Board members to offer any suggestions for discussion at the next Board meeting.

Karch raised the question of whether a repeat of the customer survey the Board initiated in 2014 was in order.  Following discussion, the Board agreed to conduct a customer survey in 2019, and to consider a proposal at the next Board meeting.

Karch asked the Board to consider doing a driveway condition assessment in 2019.  Following discussion, McDonald and Rinnan agreed to conduct a driveway assessment and report back at the next Board meeting.

Members asked that the gutters and downspouts be cleared, as soon as the roofing jobs are completed.

Next Meeting

The next regular Board meeting will be held July 8, 2019 at the home of Mike Tierney, 7409 Zircon Drive SW, at 7:00 PM.

It was moved and seconded to adjourn the meeting.  The motion passed and the meeting was adjourned at 8:54 PM.

Respectfully submitted,


_____________________________
Ken Karch, PE, Board President

Oakbrook Townhouses Board Meeting Minutes May 13 2019



Minutes of Board of Directors Meeting
May 13, 2019
Oakbrook Townhouses, Inc.
c/o Northwest Properties Agency, Inc.
9527 Bridgeport Way SW
Lakewood, WA 96499

The regular meeting of the Board of Directors of Oakbrook Townhouses (OT) was held May 13, 2019 at the home of Dave Hamann, 7533 Zircon Drive SW, Lakewood, WA.

A quorum being present, Board President Ken Karch called the meeting to order at 7:05 PM.

Board members present were Al Glamba, Dave Hamann, Ken Karch, Mike McDonald, Carol Rehnberg, and Mike Tierney. Also attending were members Nancy Dilworth, Kathy Johnson, Barbara Lancaster, Lew and Pam Mildon, Cathie Reid, Lori Wear, and Dan Zahody; guests Debbie Laeha, Tim Lancaster, and Steven Thompson; and Bill and Pat Price from Northwest Properties.

Member Comments

Members present indicated interest in addressing the Board on erosion control at 7507 and 7513, the cluster mailbox proposal, and CC&R/Bylaws violations at 7509.

Tim Lancaster passed out materials pertaining to the erosion control measures at 7513 and, with Barbara Lancaster and Debbie Laeha asked for additional measures to be taken. Karch indicated the Board would seek an engineering review of the situation.

Members commented on the distance to the new cluster mailboxes, disruption of vegetation, and the environmental effects and safety issues at 7631.

Members commented on a number of issues of concern at 7509 Zircon, including parking violations, constant comings and goings, a tent-like and a wood frame structure behind the unit, frequent police visits, garbage cans out in the open, unregistered vehicles, an intentionally damaged overhead garage door, and noise at all hours. 

Minutes

Rehnberg moved and Mike McDonald seconded to approve the April 8, 2019 Board meeting minutes as submitted.  The motion passed.

Old Business

Karch reported that the reroofing of Buildings 8 and 9 is completed, and on Building 7 is proceeding, and thanked members who had offered their driveways for temporary placement of the required dumpsters, including Cathie Reid, Elizabeth Willis, Barbara Lancaster, and Mike McDonald.

Karch reported that work on reroofing of Buildings 1, 3, 4, 5, and 6 is about to start following approval for delivery of materials.  All this work is warrantee correction work at no cost for the new roofing material.

Karch reported that work on the drainage mapping project has been underway, but we have not yet received the end products.

Karch reported that work on driveway replacement at 7415 is scheduled to begin May 14, 2019. 

Karch reported on a proposal received for stabilization of the slope behind 7507.  The owner (Cathie Reid) and Karch met with the contractor and feel the work is needed.  Following discussion, Mike McDonald moved and Hamann seconded to seek further bids for the work.  The motion carried.
  
New Business

Karch presented the proposal for earthquake insurance from Bell-Anderson. Following discussion, Rehnberg moved and Mike Tierney seconded to approve the proposal for earthquake insurance in the amount of $13,350, including a reduction in the policy deductible from 10% to 5%, subject to a minimum of $50,000, and authorize the President to execute necessary paperwork.  The motion carried.

Closed Session

The Board agreed to go into executive session for the purpose of discussing legal issues relating to violations of the CC&Rs and Bylaws and the cluster mailbox issue. 

Following the closed session, the Board agreed to contact the City of Lakewood regarding code violations at 7509; to contact an attorney to begin legal action on the situation at 7509; to secure an engineer’s assessment of the soil stability at 7513; to maintain the proposal to install 6 cluster mailboxes rather than any other number; to investigate whether a modest adjustment of the location of the cluster mailbox between buildings 3 and 4 could be made; and to secure an additional bid to implement the 6-mailbox solution.   

Karch proposed that the Board consider the issue of the degree to which over-height vegetation presents traffic safety issues at several Oakbrook Townhouses locations.





Next Meeting

The next regular Board meeting will be held June 10, 2019 at the home of Mike McDonald, 7531 Zircon Drive SW, at 7:00 PM.

It was moved and seconded to adjourn the meeting.  The motion passed and the meeting was adjourned at 9:15 PM.

Respectfully submitted,



______________________________
Ken Karch, PE, Board President



Friday, May 3, 2019

Oakbrook Townhouses Board Meeting Minutes April 8, 2019



Minutes of Board of Directors Meeting
April 8, 2019
Oakbrook Townhouses, Inc.
c/o Northwest Properties Agency, Inc.
9527 Bridgeport Way SW
Lakewood, WA 96499

The regular meeting of the Board of Directors of Oakbrook Townhouses (OT) was held April 8, 2019 at the home of Steve Rinnan, 7407 Zircon Drive SW, Lakewood, WA.

A quorum being present, Board President Ken Karch called the meeting to order at 7:05 PM.

Board members present were Al Glamba, Dave Hamann, Ken Karch, Mike McDonald, Carol Rehnberg, Steve Rinnan, and Mike Tierney. Also attending were member Kathy Johnson; and Chris Morris and Michelle Selberg from Northwest Properties.

Minutes

Hamann moved and Rinnan seconded to approve the March 11, 2019 Board meeting minutes as submitted.  The motion passed.

Goals

The Board discussed the Criteria for Prioritzing Work of the Association.  Following discussion, Hamann moved and Rehnberg seconded to approve the criteria as updated for 2019.  The motion passed.

The Board discussed the Proposed Goals for 2019 for the Association.  At this time, Jim Pearcy, Treasurer arrived.  Following discussion, which included adding reference to the drainage mapping project, reroofing of buildings 1 plus 3 through 9, and completion of the cluster mailbox system, Hamann moved and Tierney seconded to approve the Goals as updated for 2019.  The motion passed.

Re-Roofing Building 1, 3, 4, 5, and 6

Karch reported on the status of warrantee work for re-roofing Buildings 1, 3, 4, 5, and 6, with a proposal from Contractors Roofing Service in the amount of $74,415 to the Association, with an additional $68,250 being picked up by the manufacturer for replacement of defective material itself. Investigation indicated the cost of the last reroofing of those five buildings in the 2005 to 2008 time frame was $103,423.  Karch pointed out that accepting this proposal would allow deferring virtually all of the $419,554 estimate for re-roofing scheduled in the current reserve study for 2025 to 15 or 20 years beyond that date.  Efforts to secure additional Certainteed-certified roofing company proposals have been unsuccessful.  Following discussion, McDonald moved and Hamann seconded to approve the proposal by Contractor’s Roofing Service to proceed with replacement of warrantee material from Certainteed, as provided in the CRS proposal dated April 8, 2019, in the amount of $74,415 plus tax, and to authorize the President to execute documents necessary to proceed. The motion carried.

Drainage Mapping

Karch reported on proposals from Drain-Pros of Puyallup requested by the Board to TV and map the rear drainage system of Buildings 1 through 6.  Following discussion, Hamann moved and Tierney seconded to approve the proposal from Drain-Pros of Puyallup to TV drainage lines, and undertake other work to the rear of Buildings 1 through 6, as specified in its March 20, 2019 proposal, in the amount of $4,742, plus tax, and to authorize the President to execute documents necessary to proceed. The motion carried.

Treasurer’s Report

Pearcy reported on the March, 2019 financial results, including partial payments and timing for re-roofing Buildings 7, 8, and 9; and a recent PDQ contractor bill.  Following discussion, McDonald moved and Rehnberg seconded to accept the Treasurer’s report with a minor correction.  The motion carried.

Cluster Mailbox Proposal

The Board discussed alternative location arrangements for the cluster mailboxes, approvals necessary, cost factors, transition period and licensing requirements for installation, utility easements, acceptance by members, disposal of old boxes, and other matters. The Board tentatively agreed that six clusters would be the most cost-effective.  Board members McDonald and Hamann agreed to contact the Mailbox Guy and the Post Office to investigate these and other questions, determine next steps, and report back to the Board with recommendations.

Dryer Vent

The Board discussed possible changes to the draft policy on dryer vents.  Following discussion, Rehnberg moved and Rinnan seconded to approve the Dryer Vent Policy, as amended by discussion on April 8, 2019, and to distribute it to the membership. The motion carried with McDonald voting no.

Driveway Approval

The Board discussed a proposal received from Concrete Impressions to replace the driveway at 7415 Zircon, one of four considered during 2018.  Two additional bids were received from other companies, but the CI bid was the lowest, and it was the company which has successfully done many other driveways in Oakbrook Townhouses. Following discussion, Hamann moved and Rinnan seconded to approve the proposal by Concrete Impressions to replace the driveway at 7415 Zircon Drive, as provided for in its undated proposal of approximately 8/23/2018, in the amount of $6,064 plus tax, and to authorize the President to execute documents necessary to proceed. The motion passed.

Miscellaneous Old Business

Karch reported 1) that the inside ceiling repair at 7421 Zircon has been completed by a contractor to CRS, at no cost to the Association; 2) that the re-roofing of Buildings 7, 8, and 9 has started, a modest change order approved and work temporarily delayed due to weather conditions; 3) that we failed to receive an expected proposal for a slope stability project at 7507 Zircon; 4) that deck and railing repair at 7627 Zircon is underway or has been completed; 5) that the audit is underway; 6) that our tax filing will be filed on time, and includes no taxes owed; 7) that we have contacted our insurance broker to secure information on our upcoming earthquake insurance, renewal of which can be approved at the May meeting; 8) that work on an erosion control project at 7513 is underway or has been completed; 9) and that several questions had been asked regarding status of work at 7807 Zircon, including building re-roofing, a roof leak, gutter overflow, brick on the front of the unit, and responsibility for outside water faucets, for which NWP has been asked to respond.

Members also discussed a mental health issue and a stolen truck in the community.

Next Meeting

The next regular Board meeting will be held May 13, 2019 at the home of Dave Hamann, 7533 Zircon Drive SW, at 7:00 PM.

It was moved and seconded to adjourn the meeting.  The motion passed and the meeting was adjourned at 9:00 PM.

Respectfully submitted,



______________________________
Ken Karch, PE, Board President


Oakbrook Townhouses Board Meeting Minutes March 11, 2019



Minutes of Board of Directors Meeting
March 11, 2019
Oakbrook Townhouse, Inc.
c/o Northwest Properties Agency, Inc.
9527 Bridgeport Way SW
Lakewood, WA 96499

The regular meeting of the Board of Directors of Oakbrook Townhouses (OT) was held March 11, 2019 at the home of Jim Pearcy, 7813 Zircon Drive SW, Lakewood, WA.

A quorum being present, Board President Ken Karch called the meeting to order at 7:09 PM.

Board members present were Al Glamba, Ken Karch, Jim Pearcy, Carol Rehnberg, Steve Rinnan, and Mike Tierney. Also attending were members Kathy Johnson and Cathy Reid.  Also attending were Chris Morris and Michelle Selberg from Northwest Properties.

Karch distributed the updated Board member roster for 2019.

Minutes

Piercy moved and Rinnan seconded to approve the February 18, 2019 Board meeting minutes as submitted.  The motion passed.

Treasurer’s Report

Pearcy reported on the January and February financial results, including a down payment on the re-roofing job on Buildings 7, 8, and 9, approved last month by the Board. The Board noted that, while this job will require a significant expenditure from our Special Projects account, it will, along with additional roofs expected to be approved later this year for Buildings 1, 3, 4, 5, and 6, under material warrantee provisions, remove a substantial reserve account item, $419,000, scheduled for 2025 in the most recent Reserve Study. Following discussion of roofing, cable, and other costs, Rehnberg moved and Tierney seconded to accept the Treasurer’s report.  The motion passed.

Member Comments

Members described issues of concern to them in the areas of slope stability, fallen trees, soil erosion, homeless encroachments in the Chambers Creek canyon, and member behavioral issues.

Old Business

The Board discussed the next steps needed to implement the cluster mailbox proposal, and the status of ceiling and wall damage repair at 7421.

The Board was informed of efforts to secure contractors to re-roof Building 1, 3, 4, 5, and 6 under materials warrantee provisions, and the current status of the re-roofing plan for Buildings 7, 8, and 9.

The Board discussed the need to secure additional proposals for driveway replacement at 7415 Zircon; on recent actions taken to understand the dryer vent concerns of two or more members; the current status of the Oakbrook Park Planned Development District; and the status of the Chambers Creek Canyon trail.

Karch briefed the Board on recent discussions with our general contractor on erosion at 7513 Zircon, the dryer vent issue, and inventorying the rear drainage system.

The Board agreed to refine, if needed, the goals priority criteria; and to develop a set of goals for 2019 at the next meeting. 

New Business

The Board learned this day of a request for deck and railing work at 7627 Zircon and agreed to have our general contractor investigate and report back on the condition of each.

Next Meeting

The Board was reminded of the upcoming Board Orientation session on March 25, 2019 at the home of Ken Karch, 7419 Zircon Drive SW at 7:00 PM, and asked to be sure to bring their orientation notebooks.   Members are welcome at this working session.

The next regular Board meeting will be held April 8, 2019 at the home of Steve Rinnan, 7407 Zircon Drive SW, at 7:00 PM.

It was moved and seconded to adjourn the meeting.  The motion passed and the meeting was adjourned at 9:30 PM.

Respectfully submitted,



______________________________
Ken Karch, PE, Board President

Friday, February 22, 2019

Oakbrook Townhouses Board Meeting Minutes February 18 2019



Minutes of Board of Directors Meeting
February 18, 2019
Oakbrook Townhouse, Inc.
c/o Northwest Properties Agency, Inc.
9527 Bridgeport Way SW
Lakewood, WA 96499

The regular meeting of the Board of Directors of Oakbrook Townhouses (OT) was held February 18, 2019 at the home of Dave Hamann, 7533 Zircon Drive SW, Lakewood, WA.

A quorum being present, Board President Ken Karch called the meeting to order at 7:08 PM.

The Board welcomed our newest member, Mike Tierney, of 7409 Zircon Drive, elected at the 2019 Annual Members’ meeting.

Karch reminded members that, with the addition of a new Board member, our Board meeting quorum requirements changed to 5 instead of 4.

Board members present were Al Glamba, Dave Hamann, Ken Karch, Mike McDonald, Jim Pearcy, Steve Rinnan, and Mike Tierney.

The Board updated the Board member roster for 2019.

The Board updated the Board Orientation Notebook, and decided to conduct one or more two-hour orientation sessions for Board members, the first to be held Monday, March 25, 2019 at the home of Ken Karch, 7419 Zircon Drive SW at 7:00 PM.  Any member is welcome to attend.

Minutes

Piercy moved and Hamann seconded to approve the December 10, 2018 Board meeting minutes as submitted.  The motion passed.

McDonald moved and Hamann seconded to accept the January 15, 2019 Annual Members’ meeting minutes as submitted for presentation to the members for approval at the 2020 Annual Members’ meeting.  The motion passed.

Hamann moved and Glamba seconded to approve the January 15, 2019 Board meeting minutes as submitted.  The motion passed.

Annual Member Meeting After Action Review

Board members indicated satisfaction with the size of the meeting room; the quorum being met; with the lack of electronic media; chartboard displays; and positive feedback on the cluster mailbox proposal.


Treasurer’s Report

Pearcy reported that the usual financial report had not yet been received, noting the recent snow event and holiday closures, but that financial decisions made during late 2018 ensured a healthy financial situation by the end of the year, as reported to the membership at the Annual Members’ meeting.  The Board will review the January and February financial results at the March Board meeting.

Old Business

The Board discussed the next steps needed to implement the cluster mailbox proposal.  A first step is the recording of the results of the amendments to the CC&Rs, approved by the membership on January 15, 2019.  The Board agreed to invite The Mailbox Guy to attend the next Board meeting to assist in its deliberations.

Karch reported we are awaiting a proposal from CRS on internal water damage at 7421.

Karch reported on potential reroofing of buildings 1, 3, 4, 5, and 6 under material warrantee provisions.  Further information is expected shortly.  On motion by McDonald and second by Piercy, the Board agreed to request NWP to seek additional bids for the installation portion of the reroofing job. 

Karch reported on the search for bids to reroof Buildings 7, 8, and 9 with a tapered roof system, which would eliminate standing water, the source of most leaks. The Board reviewed bids received from Contractors’ Roof Service (CRS), totaling $182,985, and from Flat Roof Pros (FRP), totaling $218,434.71, both plus State sales tax.  The Board noted that each of the three bids from CRS was less than the comparable bid from FRP; the warrantee provisions for the CRS bid were better than that from FRP; and that the Association has had positive results on two prior reroofing jobs with CRS.

Following review and discussion, Piercy moved and Tierney seconded to approve the CRS bid to reroof Building 7, in the amount of $62,995; Building 8, in the amount of $57,995; and Building 9, in the amount of $61,995; all bids plus State sales tax, to notify CRS of the action taken by the Board, and to authorize the President to take necessary actions to implement the Board’s action. Funds are available in the reserve account or in the special projects account, without need for a special assessment.  The motion carried with McDonald and Hamann abstaining due to conflict of interest.

The Board reviewed the issue of dryer vent blockages and tentatively agreed that the Board’s previous policy that issues lying within the bounds of the owners’ units were the owner’s responsibility (except for those resulting from issues which were external to the unit, such as internal damage from external water leaks), as stated in Article IV Section 5 of the Bylaws, which reads:

“…SECTION 5 (Note: New Section 5 added by amendment at the Oakbrook Townhouses, Inc. Annual Meeting on January 17, 1995) Each owner of a dwelling unit is responsible for all maintenance and repair of the interior of the unit, defined as the inside drywall and ceiling of the unit. Interior damage caused from external wear and tear is the responsibility of the Association…”

The Board agreed to consider special circumstances relating to dryer and other vents at the next meeting.

New Business

The Board agreed to review the results of the slope stability study and to identify issues to work on in 2019.  KMK agreed to check on the status of our drainage inventory and to revive the drainage inventory proposal.

Karch reviewed a request for erosion repair at 7513 Zircon.  The Board agreed to ask our maintenance contractor visit the location and report back.

Karch reported on a request for approval for a gas line extension for 7611 Zircon Drive SW.  Following discussion, on motion by Glamba and second by McDonald, the Board approved the request.

The Board agreed to undertake a review of priorities and goals for 2019 at the next Board meeting.

Glamba reported on an unauthorized and unlicensed motor vehicle parked in the driveway at 7613 Zircon Drive SW and being used as a shelter for an individual.  Following contact with the property owner and realtor, Glamba authorized removal of the vehicle and the individual was escorted off site by the Lakewood Police Department.

Next Meeting

The next Board meeting will be held March 11, 2019 at the home of Jim Pearcy, 7813 Zircon Drive SW, at 7:00 PM.

It was moved and seconded to adjourn the meeting.  The motion passed and the meeting was adjourned at 9:27 PM.

Respectfully submitted,



__________________________________________
Ken Karch, PE, Board President


Oakbrook Townhouses Board Meeting Minutes January 15 2019


Minutes of Board of Directors Meeting
January 15, 2019
Oakbrook Townhouses, Inc.
c/o Northwest Properties Agency, Inc.
9527
Bridgeport Way SW
Lakewood, WA 98499
A special meeting of the Board of Directors of the Oakbrook Townhouses was held January 15, 2019 at the Oakbrook RMG Golf Club, 8102 Zircon Drive SW, Lakewood, WA 98498.
A quorum being present of the current and newly elected Board members, President Ken Karch called the Board meeting to order at 8:55 pm.
Board members attending were Al Glamba, Dave Hamann, Ken Karch, Jim Pearcy, Carol Rehnberg, and Steve Rinnan.  Mike McDonald and Mike Tierney were out of town.
A motion was made and seconded that Ken Karch be re-elected as President, Al Glamba as Vice-President, Carol Rehnberg as Secretary, and Jim Pearcy as Treasurer.  All were re-elected.

The Board took note that Mike Tierney had been elected to the Board, and that inquiries would be made to determine whether Guy McFadden would be willing to serve.

Karch declared the 2019 officers to be:

President Ken Karch                                  Vice-President Al Glamba
Secretary Carol Rehnberg                   Treasurer Jim Pearcy
There being no further business, a motion and second to adjourn was made and passed. Karch adjourned the meeting.

Note: The next regular meeting of the board will be at 7533 Zircon Drive, the home of Dave Hamann, on Monday, February 11, 2019 at 7:00 p.m. 

Respectfully submitted,

Ken Karch, President